Modelling of GSM-R traffic resulting from automated train control (ETCS Level 2)
Analysis of traffic capability of the existing GSM-R network to determine whether automated train control and existing voice and data services is possible simultaneously
Planning of the most feasible variant for network extension to provide the required capacity for ETCS Level 2